Projects

Listed are some of our recent projects:

Ocean Grove Town Centre UDF - Car Parking Study

The purpose of this study was to provide an important input into an Urban Design Framework (UDF) that set out a clear framework for the provision and management of car parking within the Town Centre. Existing and future car parking demands were analysed, issues and opportunities identified and concept designs prepared for recommended strategies.

client: City of Greater Geelong

Buninyong Traffic Impact Study

The study involved traffic volume forecasting for the arterial road network in Buninyong to the year 2035.  The second major component was to identify options and prepare conceptual plans for works to improve pedestrian amenity, road safety and traffic management. 

clients: VicRoads & City of Ballarat

Southbank Residential Estate, Horsham

Traffic impact assessment report for a 156 lot residential subdivision.  Scope included road network design advice and identification of mitigating road works at surrounding intersections.

client: Ferguson Perry Pty Ltd

Ballarat Western Link Road - Traffic Projections Study

The Ballarat Western Link Road (BWLR) is the most significant transport investment in Ballarat for decades.  Eventually, it will connect the Western Freeway with the Midland Highway.  The objective of this study was to provide traffic volume projections for the $40M Stage 1 of the project.  Projections upon opening and over a 30 year period were provided on midblock road sections as well as turning movements at intersections.  This was combined with a peer review of intersection designs to ensure their functionality and safety were maximised.

client: VicRoads

Midfield Cold Storage Facility, Warrnambool

We provided design assessments for a four bay semi-trailer loading dock, internal accessways and driveway crossovers.  A truck traffic management plan, car parking impact assessment and truck manoeuvring swept path diagrams were prepared in support of a planning permit application.

client:  Midfield Meat International

Bridge Road Brewery, Ballarat

Car parking impact assessment report including loading vehicle access review for a proposed brewery and entertainment venue.

client: Bridge Brewery

Armstrong Creek Town Centre PSP - Road Safety Audit

This project involved a feasibility stage road safety audit of the draft Precinct Structure Plan (PSP) which considered the safety for all road users of the planned Town Centre.  The audit considered a public transport interchange, walking and cycling routes and road network layout, hierarchy and cross sections.

client:  City of Greater Geelong